Water Security Agency logo

Environmental Protection Plan

Environmental Protection Plan

A small waterfall surrounded by rocks and grass

Instructions for using this notification form:

  • Fill out the notification form.
  • Once complete, save and email it to ahpp@wsask.ca with photos of your worksite. Please note that the email and attachments must be less than 25 MB.
  • Only one location format is required. Where work will occur on or adjacent to cottage lots, you must provide the legal land description (lot, block and plan), street address (if available) and subdivision/hamlet/beach name and municipality.

Environmental Protection Plan Notification Form (Fillable PDF).

You may proceed with your activity in accordance with the eligibility requirements (Section 2) and the conditions (Section 3) of the EPP (see links below) once you submit a completed notification form and pre-construction photos of your worksite. Click the links below to review the EPP options and determine if you are eligible to use an EPP for your project.

Shoreline Stabilization Environmental Protection Plan

Bridge Maintenance, Repair and Replacement Environmental Protection Plan

Irrigation Intake and Pump Station Environmental Protection Plan

An Experienced Team

We love our Saskatchewan waterways, and we also know a lot about them. If you need help finding information or determining if your shoreline or water-related project needs a permit, we can help! Use the contact form or give us a call to get started.